Tupper West Project

Client

Start Date

September 2019

Completion Date

November 2021

Scope

Engineering Support and Site Acceptance Testing and Commissioning of a 138/25kV substation located in Dawson, BC.

Highlights

  • Finished on schedule despite no design support from original engineering firm

Challenges

  • Engineering had to work to determine the original design intent after taking over engineering from another firm as the project was going to construction.

Services Utilized

  • Full Commissioning and QA/QC
  • Primary equipment testing
  • Functional testing
  • End-to-End testing

Location

Dawson, British Columbia