Client
Start Date
February 2016
Completion Date
August 2019
Scope
Electrical Engineering, P&C and SCADA Engineering, Procurement Support, and Site Acceptance Testing and Commissioning of 115/24kV greenfield transformer station in Winnipeg, MB for Manitoba Hydro.
Highlights
- Integration of and full system testing of an in-house designed automated transformer paralleling and load transfer scheme.
Challenges
- Diagnosed incorrect graphs and tables in the manufacturer’s manual related to gas filling for the 115kV GIS breakers.
Services Utilized
- Full Commissioning and QA/QC
- Site Specific Automatic Load Transfer Scheme Testing
- Power Transformer Auxiliary Device Functional Testing
- Full Paralleling Scheme Testing
- Control Wiring Point-to-Point and CT Loop Checks
- Soil and Ground Resistivity Testing
- Technical Support of Major Equipment Procurement
- P&C & SCADA System Design and Configuration – IEC 61850
- P&C Panel Supply & Complete System Integration Testing at FAT
Location
Winnipeg, Manitoba