Client
Start Date
August 2022
Completion Date
November 2023
Scope
A 44 km 115kV transmission line using wood pole structures and 20 km distribution line to provide power to facilities throughout the mine site.
Highlights
- Single pole structures designed to minimize right-of-way and clearing
Challenges
- Congested industrial site with constant change and development
Services Utilized
- Structure design
- Foundation and anchor design
- Field engineering
Location
Northeastern Ontario