Client
Start Date
October 2022
End Date
Ongoing
Scope
EPC of 890km of +/-525kV High Voltage Direct Current (HVDC) transmission line between Central New Mexico and South-Central Arizona.
Highlights
- SunZia Wind and Transmission comprise the largest renewable energy infrastructure project in U.S. History.
- 2,169 total structures.
- 19 Unique Tubular monopole designs along with 8 lattice steel structures.
Challenges
- Unique environmental conditions which presented logistical and safety challenges
- Dynamic and complex project with many stakeholders.
- Coordinating between many working groups in engineering, procurement and construction due to project scope/size.
Services Utilized
- Engineering Project Management
- Construction Support
- Field Engineering
- Survey and Survey Management
- Regen building design
Location
Central New Mexico to South-Central Arizona