Sollair Underground Fiber

Client

Start Date

April 2023

Completion Date

December 2023

Scope

Field audit, design and permit drawing preparation for underground fiber optic cable connecting substation control buildings located at various sites.

Highlights

  • 12.5km of underground fibre
  • 2 Highway Crossings
  • 109 Utility Crossings

Challenges

  • Compressed schedule for permitting to ensure construction was completed before onset of Alberta winter conditions.
  • Extensive communication required to secure approval on proposed alignment.

Services Utilized

  • Field Design
  • Geospatial Survey
  • OSP Design
  • Underground Permitting
  • Alberta Transportation Permits (Primary and Secondary HWY Crossing)

Location

Airdrie, Alberta