Client

Start Date
April 2023
End Date
Ongoing
Scope
Design and permit the relocation of existing telecom infrastructure, allowing for the removal of five distribution poles that interfered with the construction of a new parking lot.
Highlights
- Our design of underground conduits offered an unobstructive solution to reroute fiber underneath the new parking lot.
- Worked with multiple stakeholders to facilitate the design and required permitting for a cable relocate. Requires attention to detail and proactive communication.
- Secured design and permit approvals without jeopardizing occupancy of the new arena.
Challenges
- Short timelines
- Joint-use coordination
- Multiple stakeholders
Services Utilized
- Field Survey (IKE)
- OSP Design
- Joint Use Permitting
- Pole Line Analysis