Client
Start Date
April 2023
Completion Date
December 2023
Scope
Field audit, design and permit drawing preparation for underground fiber optic cable connecting substation control buildings located at various sites.
Highlights
- 12.5km of underground fibre
- 2 Highway Crossings
- 109 Utility Crossings
Challenges
- Compressed schedule for permitting to ensure construction was completed before onset of Alberta winter conditions.
- Extensive communication required to secure approval on proposed alignment.
Services Utilized
- Field Design
- Geospatial Survey
- OSP Design
- Underground Permitting
- Alberta Transportation Permits (Primary and Secondary HWY Crossing)
Location
Airdrie, Alberta