Client
Start Date
February 2016
Completion Date
July 2019
Scope
Electrical Engineering, P&C and SCADA Engineering, Procurement Support, and Site Acceptance Testing and commissioning of 115/25kV transformer station in Winnipeg, MB for Manitoba Hydro.
Highlights
- Integration of and full system testing of an in-house designed automated transformer paralleling and load transfer scheme.
Challenges
- Working in a tight location alongside a busy road and energized 230kV substation.
Services Utilized
- Full Commissioning and QA/QC
- Control Wiring Point-to-Point and Loop Checks
- Soil and Ground Resistivity Testing
- Technical Support of Major Equipment Procurement
- Cable Ampacity, Grounding Study, Arc Flash Hazard Analysis
- P&C & SCADA System Design and Configuration – IEC 61850
- P&C Panel Supply & Complete System Integration Testing at FAT
- Gas/Test Breakers
- Test Transformers, CTs & CVTs
Location
Winnipeg, Manitoba